ELVIN JUMA / NAVIGATION
View résumé

Kenya
Open to possibilities, everywhere.

Back to the story

The complete engineering portfolio

The work.
And the way here.

From first experiments to pharmacy networks, local marketplaces, and software that keeps a kitchen moving. Follow a story, find an industry, or go straight to a project.

THE BODY OF WORK107↗

repositories, in context

10 industries2024—2026

The complete collection

Every project.
In its own context.

Start with an industry. Open a project when it catches your eye. Or search straight for a name, technology, or problem.

107 of 107 repositories · grouped by the work they serve

107 repositories, not 107 separate products. Supporting services stay connected to their parent applications. Earlier versions, demos, studies, starters, and the upstream fork keep their own identities.

Dates show repository creation → latest reviewed push in Kenya time, as reviewed on 3 October 2026. They describe recorded activity, not launch dates or continuous work. Some source repositories require access.

See how the work developed
The development record2024 — 2026

The work has
a history.

From JavaScript foundations to connected business software, mobile platforms, and pharmacy systems. Each chapter adds a different kind of engineering.

  1. 2024

    Foundations

    Interfaces became applications.

    Explore 2024
    1. May–Oct 2024Learning through interfaces

      Forkify exercises, early messaging, React and Expo starters, a 3D portfolio, and an iPhone product-page study appear in the repository record.

      A foundation in JavaScript, interface construction, animation, and application tooling. Learning exercises and starters keep their own place in this story.

    2. Dec 2024ClassMind and shared information

      ClassMind and early realtime chat work bring shared resources, messages, and institutional workflows into focus.

      Meaningful application work was already present in 2024, with data models and backends supporting the interface.

  2. 2025

    Connected business software

    Screens became working systems.

    Explore 2025
    1. Jan–Apr 2025Exploring the whole stack

      Commersely, AI prototypes, communication studies, inventory work, and timetable and school sketches broaden the application work.

      Commerce, AI, data modeling, and realtime systems introduced more connected workflows and new technical questions.

    2. May–Jul 2025Connecting customer and admin work

      Professional portfolios, e-commerce variants, the Commersely frontend and backend, notification tools, dashboards, and publishing appear together.

      Customer journeys and administration began sharing a clearer foundation, with reusable experiments in notifications and other integrations.

    3. Aug–Oct 2025Modeling real operations

      The church platform, Inventory V2, Concept Builders, payment demonstrations, and a dedicated communication service mark a larger operational scope.

      The work moved further into business-specific relationships: stock movement, people, projects, payments, and coordination.

    4. Nov–Dec 2025Marketplaces meet local infrastructure

      Zion Hill, JustInTime, Sasa Cleaners, and the Restaurant / Hotel Intranet extend the record into marketplace and hospitality workflows.

      Multi-role applications sat alongside desktop and local-network engineering, including restaurant operations designed for unreliable internet.

  3. 2026

    SaaS, systems & healthcare

    The scope kept growing.

    Explore 2026
    1. Jan–Mar 2026Education, mobile, and product ecosystems

      GTSS, German Virtual School, Exam Prep Portal, Uni-Link, OppsLab, Kampus, Kitabu, and profile work appear in this period.

      Education operations, mobile architecture, AI-assisted discovery, and focused utility applications widened the product range.

    2. Apr–May 2026Verification, automation, and domain depth

      The Moi Chapter election system, portfolio experiments, an automotive interface, GTSS Growth Engine, and the airline assignment add new forms of systems work.

      Verification-sensitive workflows, automation and distribution, and broad academic domain modeling bring different engineering constraints into view.

    3. Jun–Jul 2026Industry workflows and field demos

      Architecture prototypes, Novaform, water-business sites, Piki, MajidOS, the Mama Oliech concept, and the pharmacy foundation appear in the record.

      Industry-specific design and reusable business workflows connect the interface work to practical discovery, ordering, service, and operational needs.

    4. Aug 2026Healthcare discovery and pharmacy networks

      Afyvia, clinic and laboratory sites, the distinct Aether network prototype, 20timeline, and Medivyx concentrate the work around healthcare and visual storytelling.

      Patient journeys, medicine discovery, pharmacy-network interfaces, and portfolio storytelling receive closer attention. The projects retain their separate identities.

    5. Sep 2026Deeper pharmacy operations

      Sphere Pharmacy and Kephane join continued repository activity in Afyvia, portfolios, Concept Builders, and Commerseley.

      Pharmacy operations, integrations, and refinement of established projects strengthen the connection between customer journeys and the work behind them.

    6. 1–3 Oct 2026Making the body of work visible

      GitHub profile and course-repository activity accompanies the complete portfolio review prepared on 3 October 2026.

      The record is organized into stronger project stories while preserving supporting services, experiments, learning work, and starters in the archive.

What are we
building next?

Let's talk